Clarcor Filterhouse Structural System

Clark Engineering collaborated with Clarcor Industrial Air in their development for the inlet air filtration system of a simple cycle mobile gas turbine generator. Clark worked with Clarcor’s engineers and designers to develop the structural system of the filterhouse for use in Clarcor facilities around the world. The project included designing and analyzing the filterhouse to both national and international building codes.

The filterhouse needed to be designed for quick assembly on site. The entire mobile gas turbine generator set can be assembled on site in less than 11 days and produces up to 31 MW of power.